Research Programs

  1. “Modelling of nitrate-polluted groundwaters and management of degraded aquifers under uncertainty conditions”, Stavros Niarchos Foundation, Scientific Coordinator: N. Mylopoulos, Postdoctoral Researcher: Dr. P. Sidiropoulos, Budget: 50,750 € (2017-2020).
  2. “COST CA15206: Payments for Ecosystem Services (Forests for Water) (PES)” – COST Action CA15206: National Representatives: Prof. A. Loukas & Dr. L. Vasiliades (2016-2020).(https://www.forestresearch.gov.uk/research/pesforw/ ).
  3. “A European network for a harmonised monitoring of snow for the benefit of climate change scenarios, hydrology and numerical weather prediction (Harmosnow)” – ESSEM COST Action ES1404: National Representative: Dr. L. Vasiliades (2016-2018).(https://harmosnow.eu/ ).
  4. “Management Plans of Flood Risks for River Basins in Thessaly and Epirus Regions, Greece”, Special Secretariat of Water, Ministry of Environment and Climate Change, Consortium J. Karavokyris and Associates Consulting Engineers S.A. Scientific Responsible: Prof. A. Loukas. Budget: 100,000 € (2015-2018).
  5. “Evaluation of Alternative Scenarios of Irrigation Withdrawals from Pinios River for the LALR Pinios-Pumping Station B”, Region of Thessaly, Coordinator: Κ. Iakovakis, Scientific Responsible: Prof. Α. Loukas, Budget: 10,000 €(2014).
  6. “Contemporary Environmental and Technological Applications for the Monitoring, Management and Evaluation of Water Resources Systems” – Long Life Education Programme for Updating Knowledge of University Graduates (PEGA), Ministry of Education and Religious Affairs-Project: 144_20_1.2_2. Coordinator: Prof. A. Loukas, Budget: 235,000 € (2013-2015). (http://www.edulll.gr/?p=21645 ).
  7. Mathematical Modeling of Microcystis aeruginosa as a KEy-player in Lakes under REconstruction (LAKEREMAKE)”, Greek Ministry of Education – G.S.R.T., Action ARISTEIA ΙΙ, Coordinator: Ass. Prof. Ch. Laspidou, Budget: 200,000 € (2014-2016) (http://www.lakeremake.uth.gr/ ).
  8. “Assessment of EUROpean AGRIculture WATer use and trade under climate change (EURO-AGRIWAT)” – COST Action ES1106. National Representative: Prof. A. Loukas (2012-2016).
  9. “Development of an Integrated Water Resources Environmental and Socioeconomic Modeling System – Application of the System to the Restored Lake Karla (DIWRESMSARLKT)”. Greek Ministry of Education. Programme Archimedes III, Coordinator: Prof. N. Samaras, Budget: 100,000 € (2012-2014http://archimedesiii.cs.teilar.gr/site/
  10. “Development of an Integrated System for the Water Resources Quality and Quantity Monitoring and Management of Agricultural Watersheds Under Climate Change Conditions.  Application to Lake Karla Watershed (HYDROMENTOR)”, General Secretariat for Research and Technology. National Action “Cooperation”, Coordinator: Prof. A. Loukas, Budget: 450,000 € (2011-2014) http://www.hydromentor.uth.gr/
  11. “European procedures for flood frequency estimation (FloodFreq)” – COST Action ES0901. National Representative: Prof. A. Loukas (2010-2013).
  12. “Expert study for the conclusion of water supply works of Corfu and Paxoi Islands. Phase: Construction”, Ministry of Environment and Climate Change, Scientific Responsible: Dr. A. Loukas, Budget: 15,000 € (2011).
  13. “Agricultural Innovations in Mediterranean Regions (NOVAGRIMED)” – Interreg IV MED programme. Scientific Responsible: Conseil Régional Provence-Alpes-Côte d'Azur Provence - Alpes - Côte d'Azur (France). Budget:  1,850,000 € (2009-2011).
  14. “Sustainable Use of Irrigation Water in the Mediterranean Region (SIRRIMED)” – FP7-KBBE-2009-3 – Proposal Reference Number: FP7-245159. Scientific Responsible: Dr. Juan José Alarcón, Budget: 4,050,000 € (2010-2013) http://www.sirrimed.org/
  15. “Reconnaissance Study of Land Subsidence in Karla Municipality”.   Municipality of Karla.  Scientific Responsible: Assoc. Prof. A. Loukas, Budget: 10,000 € (2010).
  16. “An Exercise to assess research needs and policy choices in areas of drought (XERICHORE)” 7th Framework Program - FP7-ENV-2007-1 (ENV.2007.1.3.3.3.) Grant agreement no.: 211837.  Scientific Responsible: Dr. Anil Markandya, Budget:   1,800,000 € (2008- 2010).
  17. “Reconnaissance Study of Dam and Reservoir Development in the Position of Gavroneri Stomiou”. Municipality of Environment.  Scientific Responsible: Prof. N. Mylopoulos, Budget: 12,000 € (2009).
  18. “Open MI-Life”.  EC Life – Environment Program.  Scientific Responsible:  Dr. R. Moore, Budget:   4,000,000 € (2006-2009).